Client |
Project |
Description |
Scope of Work |
|
|
DENYS |
Collector Brussels-North
and Villorde
|
Construction of a 7.5 and 4,5 km-long sewer DN1800-2500 /
DN1600-2200 |
On-site inspection, incl. drive control |
|
|
ARGE ADL Bie-Wa PORR-Technobau
WAYSS & FREYTAG
Ingenieurbau AG |
ADL Biesdorf Wassmannsdorf, central tunnel VE3 |
Construction of a sewage pressurepipe (L=6km /
D=3m) |
On-site inspection, incl. drive control |
|
|
WAYSS & FREYTAG
Ingenieurbau AG
HOLZMANN |
380 KV BEWAG-Tunnel,
Los 6/7 |
Construction of 380 kV-cable connection, tunnel
length: 2.8km, Cross Interior cross-section: 3.08m |
On-site inspection, incl. drive control |
|
|
VMT |
Moskau Metro- and motorway tunnel, combined in
2 levels |
3 Tunnel á 1500m
2 Tunnel D= 14,2m
1 Tunnel D= 6m |
On-site inspection, incl. drive control |
|
|
VMT |
Moskau
Metro Strogino |
construction of a metroline
Length: 3km
D= 6.28m |
On-site inspection, incl. drive control |
|
|
VMT |
Limerick,
Ireland |
construction of a metroline
Length: 3km
D= 6.28m |
On-site inspection, incl. drive control |
|
|
VMT |
St.Petersburg
Vodokanal |
Construction of two tunnels
Length: 900 m
D = 2 m |
Net measurement, Gyroscope measurement |
|
|
ARGE
Citytunnel Leipzig |
Citytunnel Leipzig, Los C
|
Construction of a railway tunnel
|
Surveying consultation and support,
monitoring and net measurement |
|
|
VMT GmbH |
U 55,
Brandenburger Tor |
30 Microtunnel pipe jacking
Length: 75m
D = 1.50 m |
On-site inspection, incl. drive control |
|
|
ARGE Rohrvortrieb
Citytunnel Leipzig |
Building from auxiliary lugs to the freezing up
technology |
two tunnel
Length: 100m and 150m / D = 3m |
On-site inspection, incl. drive control |
|
|
VMT GmbH |
pipe jacking Moskau |
construction of a supply tunnel
Length: 650m
D = 2,40m |
Installation SLS-RV,
drive control,
Route computation,
net support,
net change,
SPS Adjustment |
|
|
VMT GmbH |
pipe jacking Moskau |
construction of a supply tunnel
Length: 650m
D = 2,40m |
Installation SLS-RV,
drive control,
Route computation,
net support,
net change,
SPS Adjustment |
|
|
VMT GmbH |
pipe jacking Almaty/Kasachstan |
Build for a metro
Length: 3km
D = 6m |
Installation SLS-RV,
drive control,
Route computation,
net support,
net change,
SPS Adjustment |
|
|
VMT GmbH |
pipe jacking Moskau |
construction of a supply tunnel
Length: 600m
D = 2,40m |
Installation SLS-RV,
drive control,
Route computation,
net support,
net change,
SPS Adjustment |
|
|
VMT GmbH |
pipe jacking Izegem/Belgien |
construction of a sewer
Length: 280m
D = 1,20m |
Installation SLS-RV,
drive control,
Route computation,
net support,
net change,
SPS Adjustment |
|
|
|
|
|
|
|