|
Client |
Project |
Description |
Scope of
Work |
|
|
HOCHTIEF |
Connecting-curve Neukölln |
Completion of civil engineering structures and
replacement by new structures,
Lot 1, Lot 5 |
Complete construction supervision of 5 bridges |
|
|
Keller Grundbau GmbH
ARGE Betonbau
Gebrüder Kemmer |
Lock Charlottenburg |
New Lock Charlottenburg |
Fully automatic deformation measurement
on-site inspection |
|
|
DYWIDAG |
Two bridgesfor the BAB A 100 / 113 |
6-lane development of the BAB
Berlin-Tempelhof-Neukölln |
On-site inspection |
|
|
HEILIT + WOERNER
(SenBau
WohnVerkehr) |
BAB A100, 14 BA, Los 2 |
6-lane development of trough and tunnel for the
BAB Berlin-Tempelhof-Neukölln |
Supplementary survey staking out, measurement,
computation of quantities, on-site inspection |
|
|
HEITKAMP |
Bridge over the Oder-Havel Canal |
Construction work on S-Bahn (railway) bridge
over the Oder-Havel Canal in Henningsdorf |
On-site inspection |
|
|
|
|
|
|
|