Geodetic Evidentiary Documentation (selected references)  
Client Project Description Scope of Work  
  WNA Wasserstraßen - Neubauamt Berlin Berlin Waterway South, PFA6, Lot 2 Development of Teltow Canal km 21.4 – 24.0 Evidentiary documentation survey
 
  Keller Grundbau GmbH Lock Charlottenburg Lock construction work in Charlottenburg Fully automatic subsidence measurement throughout the entire construction period with automatic TCA 2003 and DiNi12T  
  STRABAG Deutsche Bundesbank Berlin Construction and conversion of the LZB (depth of excavation pit 27m) Measuring subsidence (manually)

Fully automatic subsidence measurements throughoutthe entire construction period using an automatic TCA 2003
 
  LEONARD WEISS DBB-Forum Deformation
measurement
Deformation measurement with DiNi12T automatic measuring system  
  ARGE ADL Bie-Wa
PORR-Technobau

WAYSS & FREYTAG
Ingenieurbau AG
ADL Biesdorf
Wassmannsdorf VE 3
Central tunnel
Construction of waste-water
pressure line
Measuring subsidence  
  WAYSS & FREYTAG
Ingenieurbau AG

HOLZMANN
380 KV BEWAG-Tunnel,
Los 6/7
Construction of 380 KV cable link, tunnel length 2.8km cross-section inside: 3.08m Measuring subsidence  
         


References - Bridge Construction and Civil Engineering Projects References - Railway Line Construction

Print