Client |
Project |
Description |
Scope of
Work |
|
|
WNA Wasserstraßen - Neubauamt Berlin |
Berlin Waterway South, PFA6, Lot 2 |
Development of Teltow Canal km 21.4 – 24.0 |
Evidentiary documentation survey
|
|
|
Keller Grundbau GmbH |
Lock Charlottenburg |
Lock construction work in Charlottenburg |
Fully automatic subsidence measurement
throughout the entire construction period with automatic TCA 2003 and
DiNi12T |
|
|
STRABAG |
Deutsche Bundesbank Berlin |
Construction and conversion of the LZB (depth
of excavation pit 27m) |
Measuring subsidence (manually)
Fully automatic subsidence measurements throughoutthe entire
construction period using an automatic TCA 2003 |
|
|
LEONARD WEISS |
DBB-Forum |
Deformation
measurement |
Deformation measurement with DiNi12T automatic
measuring system |
|
|
ARGE ADL Bie-Wa
PORR-Technobau
WAYSS & FREYTAG
Ingenieurbau AG |
ADL Biesdorf
Wassmannsdorf VE 3
Central tunnel |
Construction of waste-water
pressure line |
Measuring subsidence |
|
|
WAYSS & FREYTAG
Ingenieurbau AG
HOLZMANN |
380 KV BEWAG-Tunnel,
Los 6/7 |
Construction of 380 KV cable link, tunnel
length 2.8km cross-section inside: 3.08m |
Measuring subsidence |
|
|
|
|
|
|
|