references
Railway Line Construction(selected references)  
Client Project Description Scope of Work
  Berliner Verkehrsbetriebe
(BVG)
Underground Line 5, Jakob Kaiser Platz underground station Reconstruction of the tracks on the line Inventory, determining the track geometry, staking out  
  HOCHTIEF S-Bahn railway connecting-curve Neukölln Completion and replacement of civil engineering structures, Lot 1 and Lot 5 Comprehensive supervision offive bridge construction projects  
  Berliner Verkehrsbetriebe
(BVG)
Underground Line 5,  Schillingstraße station Reconstruction of the tracks on the line Inventory, determining the track geometry, staking out  
  Berliner Verkehrsbetriebe
(BVG)
Underground Line 5,  stations: Frankfurter Tor and Samariter Straße Reconstruction of the tracks on the line Inventory, determining the track geometry, staking out  
  Berliner Verkehrsbetriebe
(BVG)
Underground Line 7,
Rudow station
Measure of reorganization and building,
Installation of a double track connection
Inventory, determining the track geometry and track connections, staking out,  marking out  
  Berliner Verkehrsbetriebe
(BVG)
Underground Line 5,  Samariter Straße station Repair and
obstruct-fair development
Inventory, determining the track geometry, staking out  
  Berliner Verkehrsbetriebe
(BVG)
Underground Line 1, stations Möckernbrücke
and Hallesches Tor
Height control at building rise
Production measuring concept, Control measurements and documentation  
  Berliner Verkehrsbetriebe
(BVG)
Underground Line 5, Magdalenenstraße station Repair of the station Inventory, determining the track geometry  
  Berliner Verkehrsbetriebe
(BVG)
Underground Line 7, Wilmersdorfer Straße station Elevator installation Local inventory in two levels, longitudinal and transverse profiles  
  Bleck & Söhne Underground Line 7,  Johannisthaler Chaussee station Surface reconstruction of the platform
staking out,
control measurements
 
  Lindner AG Underground Line 5,
Magdalenenstraße station
Measurement of the background track walls Raster stocktaking and evaluation related to a basis level  
  Wolgang Bauer
Ingenieurbau GmbH
Underground Line 5,
Frankfurter Allee station
Reconstruction of the tracks on the line Control Measurement,
Staking out of the tracks
 
  Wolfgang Bauer
Ingenieurbau GmbH
Underground Line 9, Osloer Straße station Repair and obstruct-fair development Inventory, determining the track geometry, staking out, control measurements  
  Bleck & Söhne Underground station
Alexanderplatz
Basic repair western intermediate level Measurement achievements for the soil adjustment  
  Bleck & Söhne Underground Line 6,
Alt-Tegel station
Elevator installation Staking out,
Measurement
 


References - Geodetic Evidentiary Documentation References - Foundation Engineering, Underground Construction and Earthworks

Seite drucken