Client |
Project |
Description |
Scope of
Work |
|
|
Berliner Verkehrsbetriebe
(BVG) |
Underground Line 5, Jakob Kaiser Platz
underground station |
Reconstruction of the tracks on the line |
Inventory, determining the track geometry,
staking out |
|
|
HOCHTIEF |
S-Bahn railway connecting-curve Neukölln |
Completion and replacement of civil engineering
structures, Lot 1 and Lot 5 |
Comprehensive supervision offive bridge
construction projects |
|
|
Berliner Verkehrsbetriebe
(BVG) |
Underground Line 5, Schillingstraße
station |
Reconstruction of the tracks on the line |
Inventory, determining the track geometry,
staking out |
|
|
Berliner Verkehrsbetriebe
(BVG) |
Underground Line 5, stations:
Frankfurter Tor and Samariter Straße |
Reconstruction of the tracks on the line |
Inventory, determining the track geometry,
staking out |
|
|
Berliner Verkehrsbetriebe
(BVG) |
Underground Line 7,
Rudow station |
Measure of reorganization and building,
Installation of a double track connection |
Inventory, determining the track geometry and track connections,
staking out, marking out |
|
|
Berliner Verkehrsbetriebe
(BVG) |
Underground Line 5, Samariter Straße
station |
Repair and
obstruct-fair development |
Inventory, determining the track geometry,
staking out |
|
|
Berliner Verkehrsbetriebe
(BVG) |
Underground Line 1, stations
Möckernbrücke
and Hallesches Tor |
Height control
at building rise
|
Production measuring concept, Control
measurements and documentation |
|
|
Berliner Verkehrsbetriebe
(BVG) |
Underground Line 5, Magdalenenstraße
station |
Repair of the station |
Inventory, determining the track geometry |
|
|
Berliner Verkehrsbetriebe
(BVG) |
Underground Line 7, Wilmersdorfer
Straße station |
Elevator
installation |
Local inventory in two levels,
longitudinal and transverse profiles |
|
|
Bleck & Söhne |
Underground Line 7, Johannisthaler
Chaussee station |
Surface
reconstruction of the platform
|
staking out,
control measurements |
|
|
Lindner AG |
Underground Line 5,
Magdalenenstraße station |
Measurement of the background track walls |
Raster stocktaking and evaluation related to a
basis level |
|
|
Wolgang Bauer
Ingenieurbau GmbH |
Underground Line 5,
Frankfurter Allee station |
Reconstruction of the tracks on the line |
Control Measurement,
Staking out of the tracks |
|
|
Wolfgang Bauer
Ingenieurbau GmbH |
Underground Line 9, Osloer Straße
station |
Repair and obstruct-fair development |
Inventory, determining the track geometry,
staking out, control measurements |
|
|
Bleck & Söhne |
Underground station
Alexanderplatz |
Basic repair western intermediate level |
Measurement achievements for the soil
adjustment |
|
|
Bleck & Söhne |
Underground Line 6,
Alt-Tegel station |
Elevator
installation |
Staking
out,
Measurement
|
|